Working with a Glazing Contractor: Timelines and Logistics

Typical timelines for glass partition projects, from survey and drawings to manufacture and installation, plus logistics and site coordination tips.

Glass partition installation in progress with head track fixed and a glass pane on suction lifters

Key takeaways

  • Survey only after ceilings and floor levels are final.
  • Drawing approval is often the critical path.
  • Glass manufacture lead times must sit inside the programme.
  • Book deliveries around loading bays and lifts.

Project stages

Exact durations vary by system and size. Our commercial interior glazing hub explains how we integrate with fit-out programmes.

Typical project stages
StageWhat happens
Enquiry and designReview drawings, specification and pricing
Measured surveyConfirm dimensions once levels are fixed
Shop drawingsPrepared and issued for approval
ManufactureGlass and frames made to approved sizes
InstallationTracks, glass, doors, seals and manifestation
HandoverSnagging, O&M and certification

Logistics

Large panels need loading bays, goods lifts or cranes. In central London, permits and delivery windows are common. See glass office partitioning in London.

Coordination tips

  • Fix ceiling grid and floor levels before survey
  • Approve shop drawings promptly
  • Confirm services routes before glazing
  • Protect installed glass from following trades

Questions

What usually causes delays?

Late drawing approvals, changing dimensions and access issues.